Concrete Calculator

Project measurements

Example values are editable. Check dimensions and product labels before ordering.

%
USD
Additional rectangular sections

Add a rectangle only where it does not overlap a measured section. Enter the depth for that section.

Price basis: per cubic yard. A blank optional quantity can be entered as 0.

Material estimate

Measured volume
1.133 m³
Measured volume
40 ft³
Measured volume
1.481 yd³

Calculation trace

1.132673864 m³ × 1 = 1.132673864 m³

3.048 × 3.6576 × 0.1016 m = L × W × T

Assumptions

  • Allowance explicitly selected: 0%.

Estimate the volume inside the forms, then decide how to buy it. A concrete calculator multiplies length, width and thickness, adds each separate rectangle, and applies the allowance you choose. Compare the resulting cubic yards with a ready-mix quote or convert the same volume to bags using the mixed yield.

Use this concrete calculator to estimate slab volume in cubic yards, cubic feet or cubic meters. Enter length, width and thickness, then add any measured sections. For related examples and tools, see How to Calculate Concrete for a Slab, Cubic Feet to Cubic Yards: Material Volume Conversion, Concrete Bag Calculator, Footing Concrete Calculator, Gravel Calculator. Read the CubicPilot calculation methodology for rounding, units and material assumptions.

How do you use this calculator?

  1. Measure the inside length and width of the slab and enter the planned slab thickness separately.
  2. Add each nonoverlapping rectangular slab section at its own thickness. Check that the same corner does not appear in two sections.
  3. Review the cubic yards, then ask the ready-mix supplier which order increments they accept.

What should you enter?

Length
Primary length of the measured surface or run. Measure the inside length and width of the slab and enter the planned slab thickness separately.
Width
Distance across the measured area. Measure inside the forms, perpendicular to the length.
Slab thickness
Thickness or depth of the measured material. Measure only the layer being estimated and confirm the unit before entering.
Waste / allowance
The percentage you choose to add for ordering. Compare the supplier’s minimum and short-load fee with your required yardage.
Material price per purchase unit (USD)
Optional price in USD per cubic yard of ready-mix. Use the quoted unit price before fees and taxes.

How is the estimate calculated?

Measured = sum of length × width × thickness per rectangular section. Convert cubic feet to yards by dividing by 27. Adjusted = measured × (1 + allowance / 100). Supplier order rounding is manual.

Measured ft³ = sum of (length ft × width ft × thickness in ÷ 12). Adjusted yd³ = measured ft³ × (1 + allowance ÷ 100) ÷ 27.

  • Each slab section uses its own uniform thickness.

What measurements does the concrete calculator use?

Use a tape to record length and width inside the forms. Enter thickness in inches or use the unit selector if your drawing gives it in millimeters. Split a stepped sidewalk or apron into rectangles and record the depth of each section. Set thickened edges apart only for the volume beyond the slab thickness already counted. A depth of four inches equals one-third of a foot.

How much concrete does a garage apron or sidewalk need?

Garage apron

  • 20 × 20 ft, 6 in thick
  • 10% example allowance
  1. 20 × 20 = 400 sq ft.
  2. 6 ÷ 12 = 0.5 ft.
  3. 400 × 0.5 = 200 cu ft.
  4. 200 × 1.10 = 220 cu ft.
  5. 220 ÷ 27 ≈ 8.148 cu yd.

An illustrative quarter-yard seller would round up to 8.25 cu yd.

Check. 8.25 × 27 = 222.75 cu ft, which covers 220 cu ft.

Sidewalk

  • 4 × 30 ft, 4 in thick
  • 5% allowance and example 0.60 cu ft bag yield
  1. 4 × 30 = 120 sq ft.
  2. 4 ÷ 12 = ⅓ ft.
  3. 120 × ⅓ = 40 cu ft.
  4. 40 × 1.05 = 42 cu ft.
  5. 42 ÷ 0.60 = 70 bags.

70 whole bags at that label yield.

Check. 70 × 0.60 = 42 cu ft.

How does slab thickness change cubic yards?

At a constant 120 sq ft, before allowance
ThicknessCubic feetCubic yards
3 in301.111
4 in401.481
6 in602.222

A patio, shed pad or rectangular slab needs a volume estimate, not just square footage. Measure the inside of the forms and enter the planned thickness with its unit. Add thickened or differently sized sections separately rather than treating every part as the same slab.

When should you buy bags or order ready-mix?

Use quarter-yard and half-yard quotes only when those increments are confirmed. Compute the total measured geometry first. Apply the allowance next. Round the order once, using the actual increment. For bags, compare the number of packages, their total dry weight, unloading and mixer capacity with a delivered ready-mix quote. There is no fixed volume at which every supplier becomes cheaper.

Cubic yards describe a ready-mix volume; bags describe a product quantity. If you are buying bagged mix, take the calculated volume to the concrete bag calculator and use the mixed yield on the actual package. The calculator does not choose a safe slab thickness.

Do slab edges or separate pours change the total?

Use the inside form dimensions. Concrete already counted in the main slab should not appear at full thickness again in a thickened strip. Count only the extra depth over the area of that strip. Get unclear or load-bearing dimensions checked before buying, and call 811 before digging in the US.

Measure inside the forms

  • Confirm that trench or thickened-edge concrete is counted only once.
  • Compare the supplier’s minimum and short-load fee with your required yardage.

Frequently asked questions

Can I use outside form dimensions?

Use the inside dimensions. Outside measurements count the timber as part of the concrete footprint and enlarge the order. If you are estimating from a drawing before the forms are built, record the finished inside dimensions and verify them when the forms are in place.

What if one section is thicker?

Measure the thicker part as a separate rectangle, or count only its extra depth when that footprint is already included in the main slab. Keep a labeled sketch so you can check that your calculator entries never count the same layer twice.

Should I round each section before adding?

Keep the measured volumes unrounded until you have a total. Then apply your allowance and round using the actual purchase unit. Rounding each small section separately can turn a single affordable delivery increment into multiple increments.

Can I compare bags with ready-mix by volume alone?

Volume gives you a common starting point. Then compare the bag count times price per bag against the delivered quote, including any short-load fee. Include dry weight, vehicle payload, mixing capacity and delivery access before deciding.

How do I calculate cubic yards of concrete?

Multiply length, width and thickness in feet, then divide cubic feet by 27. Convert inches of slab thickness to feet first. Any allowance you select is added separately.

How much concrete do I need for a 10 by 12 slab at 4 inches?

The measured volume is 40 cubic feet, or about 1.481 cubic yards. That excludes any allowance for uneven excavation, spillage or supplier ordering increments.

Is this a cement quantity calculator?

No. Cement is one ingredient in concrete. This tool estimates mixed concrete volume, not cement, sand or aggregate proportions for a site-mixed recipe.